Home EV Charge Points installed across scotland

Project EV

Project EV

£1,250.00 inc. VAT

The Project EV comes loaded with amazing features as standard. Project EV’s ethos is to make charging your electric vehicle as stress-free as – much like ours is to make your installation process stress free too! With our four modes of control, we believe we have the best solutions for all users.

Project EV chargers work in harmony with solar panel technology too, meaning you can charge your vehicle using the green energy generated by your solar system.

Installation Information

  • What type of Installation do you need? *

    Not sure what you need? Most properties only require a standard install, which is included in the cost of your charger. If you think your installation may be more complex, review the installation information further down the page, or contact us for advice.

  • Desired Installation Date *

Product total

Options total

Grand total

Additional information

Output

7kW

Dimensions (HxWxD)

380x240x145

Warranty

3 Years

Compatibility

Type 2

Supporting App?

Yes

Colour(s) Available

Black, Blue

Connectivity

WiFi

Guide to reading specification

What is a standard installation?

All costs quoted are inclusive of a standard installation - but what exactly does this mean? Well, the good news is, the vast majority of installations (over 90%) qualify for a standard install.  However, for your own reference, we've detailed the major difference below.

Standard Installation

Included in the cost quoted

  • Installation onto a brick or plaster wall, or to another suitable mounting point such as a post
  • Drilling though one wall (300mm)
  • 10m cable run from your fuse box, to your charger
  • Up to 10m of plastic trunking to conceal any interior wiring
  • Installation below 1.8m
  • A clear route for your cable
  • No civil work required
  • Spare ways available in your fuse box
  • Fitting and testing of electrical connections and protective equipment carried out by our NICEIC Certified Contactors
  • Demonstration of your new charge point, so you're left ready to plug and play.

Non-Standard

Minimal additional cost required

  • Installation onto an uneven surface or mounting point
  • Drilling though more than one wall
  • More that 10m cable run from your fuse box, to your charger
  • More than 10m of plastic trunking to conceal any interior wiring
  • Installation above 1.8m, high level access equipment required
  • Movement of furniture or equipment blocking your cable route
  • Civil work required
  • No available spare ways
  • 22kW charger installations, including initial assesment